London Underground Guide for Step-Free Travel
In 2026, TfL announced that work would soon begin at South Kensington (the busiest tube station without any step-free access) to upgrade the station and make the Circle and District lines accessible. In February 2024, TfL published a new plan to make the transport network more inclusive and accessible. In December 2023, £43 million of levelling-up funding to upgrade Colindale and Leyton stations was confirmed by the Government, with Colindale gaining step-free access in December 2025.
In many cases you’ll need to work out what it is reasonable for you to fix now, and what you’ll be able to fix in the future. You might not be able to argue that changing this is a disproportionate burden. A simple code change that improves your website or app’s colour contrast is relatively low cost and would improve things for a lot of people with sight impairments. In that case, you can claim it would not be reasonable for you to make those things accessible because it’s a disproportionate burden.
The firm who manages the Dartford Crossing, Conduent, has been criticised for not responding promptly, and the responses that they do give being inaccessible to disabled people. Four London boroughs – Westminster, City of London, Kensington and Chelsea, and part of Camden – have exemptions from the blue badge scheme. This was praised by Wheels for Wellbeing, a disability charity, because it would make the scheme more accessible. Dockless bicycle hire schemes have been criticised for blocking streets and therefore making pavements in certain areas of London inaccessible. Originally funded by the Greater London Council, the scheme is now run by London Councils.
In November 1984, LRT began trialling bus routes that used buses specifically designed to cater for those with disabilities. Dial-a-Ride was expanded London-wide by 1985, subsidised by a grant from London Transport initially costing around £5 million a year. New LRT buildings were built with the disabled in mind – with Harrow bus station including a disabled toilet and dropped kerbs in the design. This allowed wheelchair users to use 70% of the network, though travel through the deep-level tunnels was still prohibited over fears wheelchairs could hinder emergency evacuation. Chairman of London Transport Peter Masefield expressed a willingness to improve facilities for the disabled, but noted the challenge and costs of doing so.
For many disabled people, the only public transport option available was Dial-a-Ride, as buses were not accessible. From February 1989, all newly licensed black cabs were required to be able to take a passenger in a wheelchair. The DLR was the first major railway infrastructure project in Britain where full access for the disabled was considered from the start, with level access into the train from platforms and lifts at all stations. LRT responded by welcoming the evidence the GLAD report provided, while pointing out the high cost of delivering accessibility improvements in light of limited funds. From 1986, the design of regular buses was also modified, with non-slip handrails, illuminated stopping signs and additional steps at bus doors to reduce the step height – making it easier to access the bus.
The current proposed designs for the redeveloped Euston station – which are being designed, funded and delivered as part of High Speed 2 – would also provide step-free improvements to Euston and Euston Square Tube and rail stations. All 41 Elizabeth line stations have step-free access, with the majority of central stations being step-free from street to train. These include 92 Tube stations, 62 London Overground stations, all DLR stations and Tram stops. There is still work to do and we will ensure that this feedback shapes how we prioritise and deliver step-free stations into the future.” It is also vital that our accessibility plans are informed by disabled and older customers and I am delighted that we have had such a great response to the consultation.
Start by asking how much it would cost to make the changes needed to make your website or app accessible. If you’ve outsourced some or all of your website or app to a supplier, you’ll need to work together to make sure your website or app meets the accessibility regulations. Since 23 September 2018 all public sector websites and apps need to meet accessibility standards and publish an accessibility statement. You’ll need to explain in your accessibility statement that you’ve not made things like this accessible because they are exempt. There’s guidance to help you or your web team plan and prioritise what you’ll fix.
During the International Year of Disabled Persons in 1981, London Transport worked with disability groups to publish an accessible guide to the public transport network for the first time. Accessibility of the public transport network allows people to travel freely at a time of their choice. In late 2005, the iconic, high floor AEC Routemaster buses were withdrawn from service, making London one of the first major cities in the world to have an accessible, low floor bus fleet – 10 years ahead of the national requirement. Unlike in the United States, Underground stations built in the 1960s and 1970s made no provision for the disabled, with wheelchair users banned from the deep-level tunnels on Underground lines until 1993.
In the 1980s and 1990s, when many bus routes in London still used the high-floor Routemaster bus, London Transport ran several Mobility Bus routes for people who found the high floor buses difficult or impossible to use. London was one of the first major cities in the world to have a fully accessible the article mentioned here bus fleet. Accessibility features on board the low-floor trams include wheelchair spaces, audiovisual announcements of stops and emergency intercom. In January 2026, work at Bushey, South Croydon and Upminster was put on hold, with other stations continuing to detailed design.